(no subject)
Jan. 22nd, 2009 08:50 pm1 seam done. Now we have a ~3.6 m x 8.1 m long piece to attach to a 8.1 m x 1.8 m.
Plans for next time/seam include:
Fold out, rolling pin flatten, then do the fold over and tape and rolling pin again*.
A trolley may help**.
Ditto ramps**.
It should be noted that we do occasional learn from experience... but possibly at a slower rate than goldfish...
Time to get back to taping.
Edit: end of the evening and one length is sewn. Next untaping, unstapling, flattening and rolling pinning etc. But before then, SLEEEEEEP....
* Plausible
** Wistful thinking given the time frames involved, but maybe for the next tent. Z thinks we may have it perfected in about 30 years...
Plans for next time/seam include:
Fold out, rolling pin flatten, then do the fold over and tape and rolling pin again*.
A trolley may help**.
Ditto ramps**.
It should be noted that we do occasional learn from experience... but possibly at a slower rate than goldfish...
Time to get back to taping.
Edit: end of the evening and one length is sewn. Next untaping, unstapling, flattening and rolling pinning etc. But before then, SLEEEEEEP....
* Plausible
** Wistful thinking given the time frames involved, but maybe for the next tent. Z thinks we may have it perfected in about 30 years...