Tent progress
Mar. 30th, 2007 10:59 pmSo, geteld workshop tent is now in one piece with all the main machining other than the hem done. This is good and feels far more tent-like than in pieces scattered over the lounge floor. However the piece is now larger than the lounge floor or at least wont fit easily spread out, so we wait til daylight hours to take it out the back and line things up to attach the ridge bit into a loop.
Viking A-frame is also progressing, with the end holes all drilled out of the end pieces. Tomorrow is the sanding and getting the ridge and side beams done. Also it needs to be moved out of the garage and the viking bed disassembled or moved so we can get the car out.
We might make it...
Note for next time:
Industrial stapler.
Viking A-frame is also progressing, with the end holes all drilled out of the end pieces. Tomorrow is the sanding and getting the ridge and side beams done. Also it needs to be moved out of the garage and the viking bed disassembled or moved so we can get the car out.
We might make it...
Note for next time:
Industrial stapler.